By Will Schulz, Founder & CEOPublished
Key takeawaysThe short answer: a software project is failing when nobody can show you, with working software, what shipped last week and when the next thing will reach users. The early signs are dates that slip without a named cause, demos instead of releases, a deploy only one person can run, and features that take longer every month. This week, put every account in your name, ask for a build you can open yourself, measure how long a change takes to reach production, and get an independent read of the code before you spend another month.
- Projects rarely fail in one moment. They drift, and the drift shows up first in the calendar and the release log, long before anyone says the word "failing".
- Most causes sit above the code. In PMI's 2018 survey of 5,402 project professionals, the three most cited causes of failed projects were changing organisational priorities, changing objectives and inaccurate requirements.
- Measure before you argue: how long a change takes to reach users, how often a release breaks something, and whether anyone other than the vendor can deploy.
- The first week's job is control, not code. Repositories, hosting, domains and keys belong in your organisation's name before any difficult conversation.
- A short independent audit costs far less than another month of the same, and it turns a feeling into a document you can act on.
The call usually comes in the same shape. A founder has paid an agency or a contractor for six months, the launch date has moved three times, and every update sounds reasonable on its own. Nothing is obviously on fire. There is just no product in anyone's hands. Here is how to tell whether that is a bad patch or a failing project, and what to do in the next five working days either way.
How do you know a software project is failing?
When the evidence of progress is talk rather than working software. A healthy project can show you something new, running somewhere you can open, every week or two. A failing one shows you status reports, slide decks and screen recordings. The signs fall into three groups.
In the schedule- Dates move without a named cause. A slip with a reason ("the payment provider's sandbox was down for four days") is normal. A slip with no reason, or a new reason every time, means nobody is tracking the work.
- Everything is "nearly done" for weeks. The last ten percent of a feature is where the edge cases live. If a feature has been almost finished for a month, the estimate was never built from a list of what finished means.
- Scope grows and nothing comes out. New requests land, old ones never close. PMI's 2018 survey found that 52 percent of projects completed in the previous year experienced scope creep, up from 43 percent five years earlier. It is common, which is exactly why it needs watching.
- Demos happen on a developer's laptop. If there is no staging address you can open from your own phone, there may be no deployable product at all.
- Every fix breaks something else. Bug counts rise while the pace of features falls. That pattern usually means there are no automated tests around the parts that matter.
- Each feature costs more than the last. Martin Fowler describes this as the interest on technical debt: a feature that should take four days takes six because of the mess around it. When the ratio keeps worsening, the codebase is charging you more every month.
- One person holds the deploy. If a release depends on one developer's laptop, credentials or memory, the project is one resignation away from stopping.
- You do not have admin access to your own product. The repositories, the cloud account or the domain sit in the vendor's name, and getting access "is on the list".
- Answers get vaguer and the people keep changing. The senior engineer from the sales call has not been seen since month two, and each new face needs a fortnight to catch up.
- Invoices arrive on time and releases do not. The billing cadence is the only cadence the project still has.
One of these on its own is a conversation. Three or more at once is a pattern, and patterns do not fix themselves.
Why do software projects fail?
Mostly because of decisions made above the code, which then show up in it. PMI asked respondents for the primary causes of the projects their organisations had deemed failures. The top three were a change in the organisation's priorities (39 percent), a change in project objectives (37 percent) and inaccurate requirements gathering (35 percent). Inadequate sponsor support was named by 26 percent. Very little of that list is about programming.
For a startup, those causes have familiar faces. The founder's pitch changes after a round of customer calls, and the build chases it. Nobody wrote down what the first version must do, so the developer guesses. The person who should be making product decisions is busy raising money, and the questions queue up.
Length makes it worse. Alexander Budzier and Bent Flyvbjerg studied 1,355 public-sector IT projects and found the typical project took 24 percent longer than expected, while 18 percent were outliers with cost overruns of more than 25 percent. Each additional year of duration added 4.2 percentage points to average cost risk. A government system is not a seed-stage product, but the lesson travels: the longer a project runs before it ships, the more room it has to go wrong. Short, shippable slices are a risk control, not a methodology preference.
Which numbers tell you how bad it is?
Four delivery measures, taken from the version history and the deploy log rather than from anyone's opinion. They come from DORA, the research programme behind the most widely used software delivery metrics.
- Change lead time. DORA defines it as the time for a change to go from committed to version control to deployed in production. If a one-line fix takes three weeks to reach users, find out where the three weeks go.
- Deployment frequency. How often the product actually ships. For an early product, "not at all in the last month" is the single loudest warning sign on this list.
- Change fail rate. The share of deployments that need immediate intervention, such as a rollback or a hotfix. A high rate with no tests is a testing problem. A high rate with good tests is a design problem.
- Failed deployment recovery time. How long it takes to recover when a release goes wrong. Hours is survivable. Days means nobody can safely change the system.
Add two that are not on DORA's list but matter just as much in a rescue: open defects by area of the product, which tells you whether the trouble is concentrated or everywhere, and whether someone new can deploy from the written instructions alone. If the answer to the second is no, you do not fully own the product yet, whatever the contract says.
You do not need tooling to get rough numbers. Ninety days of commit history, the list of releases and the issue tracker are enough for a first pass, and the gaps in those records are findings in themselves.
What should you do this week?
Take control first, then gather evidence, then decide. Five working days is enough for all three.
Monday: put everything in your name. Make a list of every account the product depends on: code repositories, cloud hosting, the database, the domain registrar and DNS, app store accounts, the payment provider, email sending, analytics, error monitoring and any AI or API keys. For each one, record who owns it and who has admin rights. Anything not owned by your company moves first. On GitHub, transferring a repository to your organisation keeps its issues, pull requests and history, and links to the old location redirect automatically, but the person transferring it needs admin access to the repository. Asking for that access is a fair test of the relationship.
Tuesday: ask for a working build. Not a demo. A staging address you can open, and written steps to build and deploy the product from a clean checkout. If the vendor needs more than a day or two to produce either, that is your answer to the question of how much of the product exists in a usable form.
Wednesday: measure. Pull the four numbers above from the last ninety days. Count open bugs by area. Note the date of the last production release.
Thursday: write down what finished means. One page: the one workflow the next release must support, for which user, and what is explicitly out. Freeze everything else until that ships. Most stalled projects do not need more features; they need one finished one.
Friday: get an independent read. Have someone who is not paid by the current team read the code, run it and tell you what they find. Tell the current team you are doing it. A good vendor will welcome a second opinion; a vendor who resists it has told you something useful.
What should you avoid doing?
Most damage in a failing project is done in the week someone loses patience. Four moves to hold off on:
- Firing the vendor before you have access. Every account and every secret should be in your hands first. Our guide to taking over a codebase from another agency covers the full handover checklist, including what to do if the old team will not cooperate.
- Adding developers as the first fix. New people usually slow a confused project down before they speed it up, because they need exactly the knowledge the current team is missing. Fix the definition of done and the deploy first.
- Starting a rewrite out of frustration. A failing project feels like a code problem and is often a process problem. Decide on evidence; our piece on whether to rebuild or refactor a stalled product sets out how.
- Signing a change order to "finish". Not without a written definition of finished and a price against it. Otherwise you are buying more of the same.
When is it time to bring in someone new?
When the week of control and evidence does not give you a working build, a recent release, or straight answers. Any one of these is enough:
- You could not get admin access to the code or the hosting by the end of the week.
- Nobody could produce a staging build or written deploy steps.
- Nothing has reached production in the last month and there is no specific reason why.
- The independent read found that what exists is materially less than what you were told.
If the problem is the relationship rather than the code, a change of team may be all you need. Before you hire the next one, the twelve questions to ask a software development agency will tell you whether they have taken over someone else's project before and how they would run the first month.
How does AW3 approach it?
We start every project rescue with a short, fixed-price audit. We read the code, run it end to end, and write down what works, what does not, and what it will take to finish, with a price. You get that document whether or not you hire us for the rest.
If we do carry on, the first work is not new features. We put tests, continuous integration and a repeatable deployment around the code that exists, so every change after that is safer than the one before. Then we finish the product in short, shippable slices.
That is how we took on Carnomaly, an automotive platform whose earlier development shop's build had stalled. We re-architected and completed the product, and in the words of their CPTO, Larry Kohlieber, it was work "where other dev shops failed". Carnomaly is now live and selling to dealerships.
We work as your development team, or as a fractional CTO if what you need is someone senior on your side of the table to manage the vendor you already have. Our studio is at SHACK15 in the Ferry Building, San Francisco, and most of the work runs remotely.
Not sure whether yours is a bad patch or a failing project? Send us what you have and we will tell you which.
Sources
- Project Management Institute, Pulse of the Profession 2018: Success in Disruptive Times, PMI, 2018
- Alexander Budzier and Bent Flyvbjerg, Overspend? Late? Failure? What the Data Say About IT Project Risk in the Public Sector, arXiv, 2013
- DORA, DORA's software delivery performance metrics, dora.dev
- Martin Fowler, Technical Debt, martinfowler.com, May 21, 2019
- GitHub, Transferring a repository, GitHub Docs
- AW3 Technology, Rescue a stalled software project